Select Your Region

Videos

Icon of the Seas Construction Update: LNG Fuel Tank Installation

October 2021 – Construction on Icon of the Seas, Royal Caribbean International’s first ship powered by liquefied natural gas (LNG), is well underway. Watch the recent installation of the game-changing ship’s first LNG fuel tank, which is 307 tons and 90 feet long. With energy-efficient technology to reduce fuel consumption and emissions, from LNG to shore power connection that removes emissions while connected at port, Icon will be a significant milestone in the cruise line’s journey to becoming emission-free. The first of the revolutionary Icon Class is set to make its debut in fall 2023, and it will make waves with a mix of innovations and adventures cruising’s never seen before.

Related Videos

PreviousNext
Health and safety protocols, guest conduct rules, and regional travel restrictions vary by ship and destination, and are subject to change without notice. Due to evolving health protocols, imagery and messaging may not accurately reflect onboard and destination experiences, offerings, features, or itineraries. These may not be available during your voyage, may vary by ship and destination, and may be subject to change without notice.